Project methology


In order to attain the objectives, the project will be divided in 3 WorkPackages. Each workpackage is subdivided into tasks.

Workpackage 1

Avalanche Information System

Task 1.1 Mutual access to existing national avalanche information
Task 1.2 Harmonization and standardization of avalanche data bases
Task 1.3 Cross tests of existing models for avalanche mapping
Task 1.4 Integration of models for avalanche mapping
Task 1.5 Tests of integrated models for avalanche mapping

Workpackage 2

Avalanche Warning Systems

Task 2.1 Set of functional requirements
Task 2.2 Detection system design
Task 2.3 Sensor selection, adaptation and tests
Task 2.4 Guidelines for industrial avalanche warning systems

Workpackage 3

Validation of models used for mapping and test of sensors used for warning purpose

Task 3.1 Data exchanges and preparation of experimental activity
Task 3.2 Coordinated experiments Task 3.2.1 Avalanche mass balance determination
Task 3.2.2 Measurement of physical parameters of non-perturbed flow
Task 3.2.3 Interaction between avalanches and obstacles
Task 3.3 Validation of numerical avalanche models

Back to Same Project